NSE                     Nash Sutcliffe Efficiency of a model's output
                        against observations
aggregate_obs           Resample observation data at a new time
                        interval
approx.pe.ts            Create sinsuiodal time series of potential
                        evapotranspiration input
brompton                Topographic and observation data for running
                        Dynamic TOPMODEL.
build_chans             Construct a raster of channel locations from
                        vector or topographic data
build_layers            Construct basic landscape layer data for
                        Dynamic TOPMODEL run
build_routing_table     Generate a network routing table
discretise              Discrete a catchment into hydrological response
                        units (HRUs)
disp.par                Default list of parameters to control the
                        graphical output during model simulation and
                        via disp.output
disp_output             Display output of a Dynamic TOPMODEL run
dynatopmodel            Implementation of the Dynamic TOPMODEL
                        hydrological model.
run.dtm                 Run Dynamic TOPMODEL using the catchment areal
                        groupings (response units) for a
                        discretisation.
time_at_peak            Time of maximum observation
time_to_peak            Time between the peak rainfall and the peak
                        discharge
upslope.area            Upslope contributing area and wetness index
                        calculation
